圍擋設(shè)置方案應(yīng)當(dāng)包括工程概況、圍擋彩色效果圖、圍擋平面布置圖、圍擋施工方案、圍擋亮化方案等內(nèi)容。其中,圍擋亮化方案包括亮化方式、燈效布置圖;圍擋施工方案包括圍擋和門樓的形式、尺寸、材料、顏色、結(jié)構(gòu)形式。景觀式圍擋還應(yīng)當(dāng)報送宣傳內(nèi)容。
The enclosure setting plan should include project overview, enclosure color rendering, enclosure layout plan, enclosure construction plan, enclosure lighting plan, and other contents. Among them, the lighting scheme for the enclosure includes lighting methods and lighting layout drawings; The enclosure construction plan includes the form, size, material, color, and structural form of the enclosure and gate building. Landscape enclosures should also submit promotional content.
第十二條圍擋設(shè)置方案作為項目法人單位申領(lǐng)施工許可證的條件,應(yīng)當(dāng)由市建委依法審查,并對圍擋建設(shè)情況驗收合格后方可辦理施工許可證。
Article 12: As a condition for the project legal entity to apply for a construction permit, the enclosure installation plan shall be reviewed by the Municipal Construction Commission in accordance with the law, and the enclosure construction situation shall be inspected and accepted before the construction permit can be obtained.
Article 13: The fence setting unit shall be responsible for the safety of the fence setting, maintain the integrity and cleanliness of the fence, and carry out the following daily maintenance work:
(一)圍擋殘缺、破損、倒斜的,應(yīng)當(dāng)及時修復(fù)或更換;
(1) If the enclosure is incomplete, damaged, or tilted, it should be repaired or replaced in a timely manner;
(二)圍擋污損、褪色的,應(yīng)當(dāng)及時清潔、粉飾;
(2) If the enclosure is stained or faded, it should be cleaned and decorated in a timely manner;
(三)圍擋板面漏字少劃的,應(yīng)當(dāng)及時更正;
(3) If there are missing words or strokes on the surface of the fence, it should be corrected in a timely manner;
(四)圍擋亮化設(shè)施燈光顯示不全的,應(yīng)當(dāng)及時修復(fù)
(4) If the lighting display of the enclosure lighting facilities is incomplete, it should be repaired in a timely manner
施工圍擋:施工圍擋距離臨邊防護(hù)多遠(yuǎn)符合規(guī)范
Construction fence: How far is the construction fence from the edge protection in accordance with the specifications
這個沒有規(guī)范,但是很多城市都有地方管理標(biāo)準(zhǔn),一般是當(dāng)?shù)亟ㄔO(shè)局和城管局制訂的。建筑施工圍擋,與建筑物高度無關(guān),以中南某市為例,要求是所有施工工地都要進(jìn)行圍擋,哪怕只是挖坑修一個雨水井。主要道路沿線圍擋不低于2.5m
There is no national standard for this, but many cities have local management standards, usually formulated by the local construction bureau and urban management bureau. The construction fence is not related to the height of the building. Taking a city in central southern China as an example, it is required that all construction sites be fenced, even if it is just digging a pit to repair a rainwater well. Fencing along major roads not less than 2.5m
關(guān)于PVC圍擋安裝標(biāo)準(zhǔn)是3文明施工保證項目的檢查評定應(yīng)符合下列規(guī)定:
Regarding the installation standard of PVC enclosure, the inspection and evaluation of civilized construction assurance projects should comply with the following regulations:
1、施工圍擋美化處理施工沿線圍擋做美化處理,噴涂供熱企業(yè)名稱、、質(zhì)量、文明施工用語,嚴(yán)禁張貼、涂寫垃圾廣告。
1. Construction fence beautification treatment: The fence along the construction line should be beautified and painted with the name, safety, quality, and civilized construction language of the heating enterprise. It is strictly prohibited to post or write garbage advertisements.
2、施工圍擋安置圍擋安裝配合工程進(jìn)展情況進(jìn)行,必須在該段工程施工前完成,以半幅路面為基準(zhǔn)。圍擋安置應(yīng)整齊穩(wěn)固,安置的位置應(yīng)以不防礙道路交通和行人通過為原則,除出入口外必須連續(xù)封閉,保證施工現(xiàn)場與外界隔離,圍擋前應(yīng)做好交通導(dǎo)向標(biāo)志,施工時應(yīng)指派專門人員維護(hù)交通秩序。圍擋區(qū)附近不準(zhǔn)堆放余土、施工材料及其他雜物,并保證該范圍內(nèi)整潔。
2. The installation and coordination of construction fences must be carried out before the construction of this section of the project, based on the progress of the project, with the half width of the road surface as the benchmark. The placement of fences should be neat and stable, with the principle of not obstructing road traffic and pedestrian passage. Except for entrances and exits, they must be continuously closed to ensure the isolation of the construction site from the outside world. Traffic guidance signs should be prepared before fences, and specialized personnel should be assigned to maintain traffic order during construction. It is not allowed to stack excess soil, construction materials, and other debris near the enclosure area, and ensure that the area is clean and tidy.