人妻夜夜爽天天天爽欧美色院_亚洲人成网线在线播放无码_性欧美熟妇freetube中国_亚洲制服类中文字幕_欧美综合缴情五月丁香_少女的悔悟潘甜甜果冻传媒资源_国产黄色三级免费看_一级毛片在线播放免费看_日韩爱爱精品一区二区三区_青柠直播免费观看日本

您好,歡迎來到山東共贏瑞建設(shè)工程有限公司網(wǎng)站!

服務(wù)熱線

13165112299

行業(yè)動(dòng)態(tài) 當(dāng)前位置:首頁(yè)-新聞資訊-行業(yè)動(dòng)態(tài)濟(jì)南玻璃雨棚:玻璃雨棚的安裝注意事項(xiàng)

濟(jì)南玻璃雨棚:玻璃雨棚的安裝注意事項(xiàng)

發(fā)布時(shí)間:2024-05-09 來源:http://01888888.cn/

  濟(jì)南玻璃雨棚的安裝注意事項(xiàng)

Installation precautions for Jinan glass canopy

  玻璃雨棚通常建在大門或陽臺(tái)上,常年暴露在戶外,暴露在風(fēng)和陽光下,所以安全性能是玻璃雨棚的一個(gè)重要參考標(biāo)準(zhǔn)。如今,玻璃雨棚市場(chǎng)上的太多了,濟(jì)南不銹鋼制品玻璃雨棚如何能夠脫穎而出,成為一個(gè)高調(diào)的,這自然有其原因。以下是對(duì)玻璃雨棚建設(shè)10大建設(shè)要點(diǎn)的詳細(xì)介紹。

Glass canopies are usually built on doors or balconies, exposed to the outdoors all year round, exposed to wind and sunlight, so safety performance is an important reference standard for glass canopies. Nowadays, there are too many brands in the glass canopy market, and there are naturally reasons why Jinan stainless steel products can stand out and become a high-profile brand. The following is a detailed introduction to the 10 key construction points for glass canopies.

  1.加工準(zhǔn)備和下料:根據(jù)施工圖的放樣和放樣,標(biāo)記材料時(shí)應(yīng)預(yù)留焊接收縮和加工余量,模板采用放樣。鋼筋校正:鋼筋在下料前需要校正,校正后的偏差值不應(yīng)超過規(guī)范規(guī)定的允許偏差值,以保證下料質(zhì)量。熱加工型鋼應(yīng)進(jìn)行熱加工,冷卻后鉆孔。鋼板預(yù)埋件和其他部件切割、鉆孔并噴涂防腐漆。

1. Processing preparation and cutting: According to the layout and layout of the construction drawing, welding shrinkage and processing allowance should be reserved when marking materials, and the template should be set out. Reinforcement correction: Reinforcement needs to be corrected before cutting, and the deviation value after correction should not exceed the allowable deviation value specified in the specifications to ensure the quality of cutting. Hot worked steel should be hot worked and drilled after cooling. Cutting, drilling, and spraying anti-corrosion paint on steel plate embedded parts and other components.

  2.濟(jì)南不銹鋼制品廠家測(cè)量放線:根據(jù)土建標(biāo)高基準(zhǔn)線,測(cè)量預(yù)埋件的標(biāo)高線,并檢查預(yù)埋件的標(biāo)高偏差和左右偏差。整理結(jié)果后,確定預(yù)埋件分離的調(diào)整和處理方案。沿地板外彈出的墨線設(shè)置預(yù)埋件的頂部標(biāo)高線。

2. Jinan stainless steel product manufacturer measurement and layout: Based on the civil engineering elevation reference line, measure the elevation line of the embedded parts, and check the elevation deviation and left and right deviation of the embedded parts. After organizing the results, determine the adjustment and handling plan for the separation of embedded parts. Set the top elevation line of the embedded parts along the ink line popping out of the floor.

  3.預(yù)埋件安裝處理:定位預(yù)埋件安裝位置、鉆孔及安裝。預(yù)埋件應(yīng)定位準(zhǔn)確,埋設(shè)牢固。標(biāo)高偏差不大于9毫米,左右位移不大于20毫米。

3. Installation treatment of embedded parts: locate the installation position of embedded parts, drill holes and install them. The embedded parts should be accurately positioned and firmly embedded. The elevation deviation shall not exceed 9 millimeters, and the left and right displacement shall not exceed 20 millimeters.

fccadf844dd6d0041399b15be911887

  4.吊臂的安裝和焊接:吊臂的安裝采用焊接,焊接需要在檢查焊接節(jié)點(diǎn)和調(diào)整吊臂的設(shè)計(jì)坡度后才能進(jìn)行。在一側(cè)的一個(gè)懸架臂精細(xì)定位后,在另一側(cè)安裝一個(gè)懸架臂,并在點(diǎn)焊之前將其精細(xì)定位。然后,基于這兩個(gè)懸架臂,拉出懸架臂的高標(biāo)高線和低,并逐個(gè)焊接其余的懸架臂。焊接無縫鋼管。當(dāng)型鋼需要加長(zhǎng)時(shí),焊接接頭并將其拉直。當(dāng)使用鋼接頭時(shí),為了使接頭鋼與鋼板預(yù)埋件相互靠近,應(yīng)按設(shè)計(jì)要求鏟去邊角。對(duì)接焊縫應(yīng)在焊縫兩端用弧形板焊接,弧形板的材質(zhì)和波形與焊接件相同,焊接后用氣割切斷并打磨光滑。

4. Installation and welding of the lifting arm: The installation of the lifting arm adopts welding, and welding can only be carried out after inspecting the welding nodes and adjusting the design slope of the lifting arm. After fine positioning one suspension arm on one side, install another suspension arm on the other side and fine position it before spot welding. Then, based on these two suspension arms, pull out the high and low lines of the suspension arms, and weld the remaining suspension arms one by one. Welded seamless steel pipe. When the section steel needs to be extended, first weld the joint and straighten it. When using steel joints, in order to make the joint steel and steel plate embedded parts close to each other, the edges and corners should be removed according to the design requirements. The butt weld should be welded with an arc-shaped plate at both ends of the weld. The material and waveform of the arc-shaped plate should be the same as that of the welded part. After welding, it should be cut off by gas cutting and polished smooth.

  5.校準(zhǔn)檢查:安裝好吊臂后,檢查現(xiàn)場(chǎng)連接部件的質(zhì)量。吊臂的安裝質(zhì)量主要檢查吊臂垂直面的垂直度,懸臂垂直面的一側(cè)在壓力下下垂,懸架臂的傾斜度。確保懸架臂滿足設(shè)計(jì)應(yīng)力狀態(tài)和整體穩(wěn)定性要求。

5. Calibration inspection: After installing the boom, first check the quality of the on-site connecting components. The installation quality of the suspension arm mainly checks the verticality of the vertical surface of the suspension arm. One side of the vertical surface of the cantilever hangs under pressure, and the inclination of the suspension arm. Ensure that the suspension arm meets the design stress state and overall stability requirements.

  6.連接承重電纜:定位拉桿基準(zhǔn)線和標(biāo)高線,按要求安裝預(yù)埋件,焊接欄桿。

6. Connect load-bearing cables: locate the reference line and elevation line of the pull rod, install embedded parts as required, and weld railings.

  7.不銹鋼玻璃爪的安裝和焊接:根據(jù)設(shè)計(jì)尺寸彈出縱橫線和設(shè)計(jì)標(biāo)高,用夾具夾緊,進(jìn)行定位點(diǎn)焊組裝后,焊接玻璃爪座。

7. Installation and welding of stainless steel glass claws: Draw vertical and horizontal lines and design elevations according to the design dimensions, clamp with fixtures, perform positioning spot welding assembly, and weld the glass claw seat.

  8.防銹漆處理:應(yīng)熔渣和飛濺物,不銹鋼零件表面應(yīng)多次噴涂白色油漆。涂層和薄膜厚度應(yīng)符合設(shè)計(jì)要求或施工規(guī)范。不得遺漏臨邊型鋼內(nèi)側(cè)的油漆。

8. Anti rust paint treatment: slag and splashes should be removed, and the surface of stainless steel parts should be sprayed with white paint multiple times. The coating and film thickness should meet the design requirements or construction specifications. Do not omit the paint on the inner side of the edge steel.

  9.夾膠玻璃加工制作安裝:根據(jù)設(shè)計(jì)要求和實(shí)測(cè)尺寸,確定玻璃的尺寸及其水平和垂直位置,由制造商制造。安裝不銹鋼玻璃卡爪,玻璃臨時(shí)固定后進(jìn)行調(diào)整。調(diào)整標(biāo)準(zhǔn)為水平、垂直和水平。偏差不得超過規(guī)定的偏差。

9. Processing, production, and installation of laminated glass: Based on design requirements and measured dimensions, determine the size of the glass and its horizontal and vertical positions, and manufacture it by the manufacturer. Install stainless steel glass clamps and adjust the glass after temporary fixation. Adjust the standards to horizontal, vertical, and horizontal. The deviation shall not exceed the specified deviation.

  10.調(diào)整檢驗(yàn):對(duì)點(diǎn)式玻璃進(jìn)行整體調(diào)整檢查,調(diào)整標(biāo)準(zhǔn)為水平、垂直、水平。偏差不得超過規(guī)定的偏差。

10. Adjustment inspection: Conduct an overall adjustment inspection on the point glass, with adjustment standards of horizontal, vertical, and horizontal. The deviation shall not exceed the specified deviation.

本文由濟(jì)南玻璃雨棚提供技術(shù)支持,更多的詳細(xì)精彩內(nèi)容請(qǐng)點(diǎn)擊我們的網(wǎng)站http://01888888.cn我們將會(huì)全心全意為您提供滿意的服務(wù)。

This article is supported by Jinan Glass Canopy. For more detailed and exciting content, please click on our website http://01888888.cn We will wholeheartedly provide you with satisfactory service.